0

Window Work

west window

On Thursday, December 5th, the first 23-foot window was installed on the west side of the building. Metal grilles secure the new pieces of glass next to the precast cement frame with geometrical precision. Some of the smaller windows on… Continue Reading

0

Heavy Equipment

Heavy Equipment A construction site is a little kid’s dream. Bright orange, yellow, and blue machines litter the construction site with the sounds of backup beeps and the roar of engines. Some of the equipment is PWC’s and their subcontractors’,… Continue Reading

0

The Crane

hess crane outside forsyth library removing debris