On August 8, 2024, a major milestone was made on the Forsyth Library Renovation. Crews cut through layers of roofing material above the south stairwell to prepare for the skylight that will serve as a column of light above the stairs. Even on a rainy day, the natural light from above flooded into the building that has been demolished down to concrete floors, ceilings, and columns. Now, crews will be able to use the roof access to remove the stairs themselves and construction debris from the lower level. Watch the video for a sneak peek at this major transformation!